Goldpreis

3 313,09
USD
12,57
0,38 %
<
Nachrichten
Nachrichten
>
<
zugeh. Wertpapiere
Zertifikate
>
<
anzeigen in Währung
Schweizer Franken
Euro
Dollar
>
16.04.2025 18:53:11

Greatland Gold lays out two-year plan for Telfer to bridge output gap

Australia’s Greatland Gold (AIM: GGP) is envisioning annual gold production of 280,000-320,000 oz. over the next two fiscal years from the Telfer mine, which it bought from Newmont (TSX: NGT) last fall.This production target, Greatland says, is based on inventory from the currently active West Dome open pit and Main Dome underground as well as run-of-mine and low-grade stockpiles.Importantly, the company says it bridges the previously perceived ‘gap’ before the Havieron mine, which it consolidated from Newmont in the same transaction, enters production in fiscal 2028.According to Greatland, the two-year plan for Telfer is expected to be further refined as it continues to progress and evaluate Telfer opportunities, with drilling ongoing to upgrade resources into higher-confidence categories. The company estimates that about 20% of the inventory are inferred resources and unclassified mineralization from exploration targets.Greatland says it is confident of making the conversion to measured and indicated categories, highlighting Telfer mine’s long operating history (40+ years) and the amount of drilling completed, and anticipates further growth beyond FY2027 by extending the open pit and underground deposits.“When we acquired Telfer, we set out an initial mine plan of 15 months together with a number of opportunities we had identified during acquisition due diligence to extend that plan,” Greatland’s managing director Shaun Day stated in a press release.“After only five months since the acquisition, this initial updated Telfer outlook already provides for a substantial 18-month extension of dual train processing at Telfer through FY27,” he added.In the March 2025 quarter, the Telfer mine produced 90,000 oz. of gold.Haverion integrationBeginning in FY28, the Havieron project is expected to begin production and be integrated with Telfer, which Greatland management believes will result in a step change cost reduction and sustained higher volume production.The Havieron deposit currently has estimated reserves of 25 million at 3 grams per tonne gold to support 221,000 oz. of annual production over its first 15 years. This is based on a steady state mining throughput rate of 2.8 million tonnes per annum, which the company is looking to expand to 4-4.5 million tonnes.A feasibility study is underway to assess the Havieron expansion, anticipated to be completed in the second half of calendar 2025.Weiter zum vollständigen Artikel bei Mining.com
Neu: Öl, Gold, alle Rohstoffe mit Hebel (bis 20) handeln
Werbung
Handeln Sie Rohstoffe mit Hebel und kleinen Spreads. Sie können mit nur 100 € mit dem Handeln beginnen, um von der Wirkung von 2.000 Euro Kapital zu profitieren!
82% der Kleinanlegerkonten verlieren Geld beim CFD-Handel mit diesem Anbieter. Sie sollten überlegen, ob Sie es sich leisten können, das hohe Risiko einzugehen, Ihr Geld zu verlieren.

Rohstoffe in diesem Artikel

Goldpreis 3 313,09 12,57 0,38